Every legacy system we take over has a folder somewhere called v2. It is usually a rewrite that started with confidence and stopped when the old system kept changing underneath it.
Why rewrites stall
A rewrite has to reach feature parity before it delivers anything. Meanwhile the business keeps asking for changes to the old system, so the target keeps moving.
- Value arrives only at the very end
- Two systems need changes at the same time
- The riskiest cut-over happens all at once
One module at a time
We put a routing layer in front of the old system. Each module is rebuilt, run in parallel, compared, then switched over. If anything looks wrong, one switch sends traffic back.
The best migration is the one users only notice because things got faster.
The first module usually goes live within two months. From there, each wave is smaller, cheaper and better understood than the one before it.