Modernization

Keep what works. Replace what hurts.

We take over legacy systems, stabilise them, then rebuild them module by module. No big-bang rewrite, no downtime.

  • −72%
    incidents per month
  • 0 min
    downtime during cut-overs
  • 6 wk → 1 wk
    release cycle

Signs you need it

Tick what sounds familiar.

Six symptoms we hear in almost every first call.

0 of 6

Sounds healthy. Keep this list for next year.

The takeover

Five steps, one switch at a time.

Pick a step to see what changes in the system, and what you hold in your hands at the end of it.

System map

  • Auth
  • Catalog
  • Orders
  • Invoicing
  • Stock
  • Reports
  • Customers
  • Payments
  • Shipping
  • Pricing
  • Users
  • Search
  • Legacy
  • At risk

We map every module, its incidents and what it costs to change. You get a written report with numbers, not opinions.

You get

  • Module map with risk scores
  • Incident and performance baseline
  • Quick wins you can ship in a week

Risk controls

Nothing changes without a way back.

Three controls run on every cut-over, whatever the size of the module.

  • Zero downtime

    Traffic switches at the routing layer. Users see the same address and the same data, just faster.

  • Parallel run

    Old and new run side by side on real traffic, and we compare results before the old path retires.

  • One-switch rollback

    Every cut-over has a rollback that is rehearsed, timed and one switch away.

Before and after

A 12-year-old ERP, rebuilt without a day of downtime

We took over the ERP behind 140 stores, stabilised it in five weeks, then replaced it module by module.

Incidents per month

Before9After2.5

Release cycle (days)

Before42After7

Page load (seconds)

Before4.2After0.9

They changed the engine while the stores kept selling. Nobody at the tills noticed, which was the point.

Sofia MarchettiHead of IT, Northgate Retail

Duration: 9 months · Team: 6 engineers

FAQ

Common questions.

Do you need the original developers?

No. We read the code, the database and the logs. Their notes help, but we do not depend on them.

Will users notice the migration?

They should only notice that it got faster. Every cut-over runs behind a switch we can flip back.

How long until we see a result?

The audit report lands in 2 weeks. Stabilisation usually removes the worst incidents within a month.

Next step

Start with a free 30-minute audit call.

Bring an architecture diagram, or just a description. We will tell you where we would start, and what it would cost.