Northgate Retail · Retail
A 12-year-old ERP, rebuilt without a day of downtime
We took over the ERP behind 140 stores, stabilised it in five weeks, then replaced it module by module.
- Client
- Northgate Retail
- Sector
- Retail
- Duration
- 9 months
- Team
- 6 engineers
- Year
- 2025
Challenge
Where it hurt.
The ERP ran stock, pricing and invoicing for 140 stores. Releases took a weekend, two incidents a week reached the stores, and the last engineer who knew the pricing engine was leaving.
Approach
What we did.
- 01
Audit
2 weeksMapped 38 modules, ranked them by incidents and business value.
- 02
Stabilise
5 weeksAdded monitoring, backups and CI; fixed the three causes behind most incidents.
- 03
Rebuild
7 monthsMoved pricing, stock and invoicing to new services behind a routing layer, one at a time.
Results
What changed.
- −72%incidents per month
- 0 mindowntime during cut-overs
- 6 wk → 1 wkrelease cycle
- 4.2 s → 0.9 spage load in stores
Before and after
Incidents per month
Release cycle (days)
Page load (seconds)
Stack
- .NET
- SQL Server
- PostgreSQL
- Next.js
- Azure
- Grafana
They changed the engine while the stores kept selling. Nobody at the tills noticed, which was the point.
Next step
Have a system that works but hurts?
Tell us what it does and where it hurts. A senior engineer replies within two business hours.